Installation & technical data

Installation Process

* Layout is marked as per the drawing, using 5 dimensional laser machine for accurate plumb & right angle, maintaining all levels.

* Top and bottom channels are placed with the help of laser alignment, verticality is being checked & installed, fixing anchor bolts and tightened with drill.

* Cut panel is being erected manually and slided in top & bottom channel and brought at the location.

* All joints are well filled with compound and mesh tape is pasted on all joints of panel and panel structure joints.

* Mesh tape is later finished with non-shrink non-crack compound.

Properties

PARTICULARSREMARKS50 MM75 MM100 MM
Fire ResistanceRatingMore than 2 hoursMore than 2 hoursMore than 2 hours
Thermal ConductivityBS4370_Part20.240.210.19
Neil Holding CapacityKgs per nail15 kg/ Nail18 kg/ Nail22 kg/ Nail
Sound Transmissiondb404244
Thicknessmm5075100
Axial Load per meterKN/m5088105
Standard WeightKg per sqm50 Kg75 Kg85 Kg
Sizemm600x3000 / 2400600x3000 / 24002400x600
DensityKg/m3850 Kg/m850 Kg/m850 Kg/m
Water Absorption%Less than 15%Less than 15%Less than 15%
Moisture Resistance-No DampnessNo DampnessNo Dampness
Combustibility-Not CombustibleNot CombustibleNot Combustible

Government Authorizations & Test Reports

Request Detailed Information